
/ 01Overview
What thisactually involves.
We install structured cabling for both data and surveillance: Cat6 horizontal runs, fibre backbones between blocks, patch panels and racks. Every link is labelled at both ends and tested, so the next fault takes minutes to trace instead of a day.
/ 02Do you need this?
Signs it's time to act
- The comms cabinet is an unlabelled tangle nobody will touch
- Faults take hours to trace because nothing is documented
- A new fit-out or building extension needs cabling from scratch
- Wi-Fi drops out in parts of the building
/ 03Capabilities
- 01Cat6 / Cat6A structured cabling
- 02Fibre backbone between buildings
- 03Rack, patch panel and cable management
- 04Managed switches, routers and VLANs
- 05Wi-Fi access point coverage planning
- 06Link testing with certification results
/ 04What's included
- Cable route and containment planning
- Labelled terminations at both ends
- Rack build and dressing
- Switch configuration and VLAN setup
- Test results and port schedule
/ 05Budgeting
What moves the price
We quote after a survey rather than over the phone, because these are the things that actually change the number — and none of them are visible from a phone call.
- 01Number of outlets and horizontal cable runs
- 02Cat6 versus Cat6A, and any fibre backbone between blocks
- 03Containment, trunking and floor or ceiling access
- 04Rack, patch panel and switch specification
- 05Whether certified test results are required on handover
/ 06Ideal for
New buildingsOffice fit-outsCampusesWarehouses
/ 07Common questions
Because the next fault is inevitable. Labelled, dressed and tested runs turn a day of tracing into a five-minute fix — and that saving lands every time something changes.
Yes: a port schedule, labels at both ends of every run, and link test results. It stays useful long after we have left site.
/ 08Related



